beltal

Home >> China News


Caused tower crane collapsed near the site 3 lay dead 2 injured subjects

WASHINGTON (trainee journalist Huang Hailei) 6 o'clock the night before, Yizhuang Economic Development Zone, Beijing Hao Miao HSBC pharmaceutical companies within the project site under construction, a crane collapsed during the landing, killing three workers dead, two injuries (newspaper reported yesterday.) Yesterday, the incident near the project area and several sites have been suspended, Yizhuang Development Zone, said the site safety supervision departments will carry out inspection, cause of the accident and responsibility confirmation is still under investigation.

yesterday morning, the incident site and a quiet, yet deal with the collapse of the tower crane, 4 Yizhuang patrol police station at the site entrance. The incident site next to a number plate marked "Prudential building," the site has also been suspended, the guard said last night tower crane collapsed because of the things, even their site included, several are near stopped.

afternoon, the reporter saw two injured Yizhuang Tongren Hospital, stay in emergency room the night before last man surnamed Wu in the has been out of danger, pushed to the surgical intensive care unit. In the surgical inpatient ward, the wounded Li Po was resting after surgery. Accident, Li Bao waist fracture, urethral rupture, the doctor has his stitches. Out of danger man surnamed Wu heard the news, showing a trace of his relaxed smile, "the two of us got left, he can live good." Li Po said the dead there are in a man surnamed Lu, 25 years old, Hebei people, there is a 4-year-old son, a few months ago gave birth to a daughter. "That's gone, too poor." Li Bao told reporters, to retrieve a life is not easy, perhaps he would for a job, "Life is too fragile, I will be more cherished."

Li Bao said he is from Henan , 25, 2007 in Beijing, has been engaged in open crane work. Last night's task, he was responsible for screwing in the intensive care unit of a driver surnamed Wu. Time of the incident, they are doing, rose top, "up top is the most difficult jobs tower crane, the hydraulic device may be a problem with the fuel tank, but also not sure."

Yesterday's links the Serious and the CMC, the responsible person on site safety supervision departments have been ordered to the vicinity of all downtime, to accept a new round of security checks. Cause of the accident, liability and compensation issues are still determined to further investigation.

It is understood that the construction crane called Wu Wei, team leaders, receiving treatment in the intensive care unit is the third brother, Wu Wei is currently controlled by the police.

Other news from China News category